Home › Everything we make › Staircases & Balustrades › Highland
Highland · Scotland
Staircases & Balustrades in Highland
Cut string or closed string stairs, handrails and spindles to Part K.
- Free measured survey
- Fixed written quote
- Workshop-made, site-fitted
- 10-year workmanship guarantee
- Fully insured
Highland is a county of rendered stone croft houses and modern kit homes across a very wide area. That is exactly the kind of building stock a staircase has to be drawn around, so we allow for it at survey stage rather than on fitting day — walls get checked for wind and plumb, floors for level, and the setting-out is taken from the worst reading, not the best.
How we approach it
Every staircase we make starts with a site survey and a set of setting-out drawings, not a catalogue page. We measure the opening in Highland, check the walls for wind and the floor for fall, then cut a carcass that fits the room you actually have.
How we build it
Hardware is specified to the weight it is carrying, not to a price point. Soft-close runners are rated for the drawer load, hinges are adjustable in three planes, and sliding gear is sized so a full-height door still moves with one finger a decade later.
Finish and materials
Every finished job gets a short handover: what the surface is, how to clean it, and how to adjust a hinge if a door drops after the heating has been on for a season. Adjustment is normal in timber and takes about two minutes once you know which screw to turn.
| Guide price | from £2,400 per linear metre, fitted |
|---|---|
| Lead time | 8–12 weeks from signed drawings |
| Construction | Oak or paint-grade |
| Survey area | All of Highland, including Inverness, Fort William, Nairn, Thurso |
Want a number now? The indicative price tool gives a range in about a minute. A free survey in Highland turns it into a fixed written quote.
Towns we cover
Other joinery for Highland
What happens next
Four steps, no surprises
Survey
A joiner visits, measures the opening, checks for level and plumb, and talks through how you want to use the space.
Drawings & quote
You get a setting-out drawing and a fixed written price. Nothing is ordered until you have approved both.
Workshop
Parts are machined, assembled and finished under cover while the site carries on with other trades.
Fit & handover
We fit, scribe, adjust and touch in, then walk you through care and adjustment before we leave.
Straight answers
Staircases & Balustrades in Highland — common questions
How long is the house without a staircase?
For a straight replacement, one to two days with a temporary means of access. We sequence so upstairs is reachable at the end of each working day.
Can I change a straight stair to a winder?
Often yes, and it is a good way to recover floor space. The tricky part is the headroom at the top of the winder and the trimming of the floor opening, which is structural work requiring a builder alongside us.
Can you replace just the balustrade?
Yes, and it is the single biggest visual change you can make for the money. New newel posts, handrail and spindles, or a glass or steel infill, onto the existing carriage.
What timber for a stair?
Oak for a natural finish — it is hard enough to take traffic. Tulipwood or engineered softwood for a painted stair. Treads take more wear than anything else in the house, so we do not use soft timber on a tread regardless of the finish.
Do I need to empty the room before you fit?
Clear the working wall and anything fragile. We bring dust sheets and a vacuum-extracted saw, but fitting makes dust and we would rather your furniture was out of the way. For kitchens we will agree a sequence with you so you keep a sink and a kettle for as long as possible.
Start with a measurement
Tell us the space in Highland — we’ll tell you what it costs
Every quote starts with a free measured survey, so the price you get is the price you pay. No deposit is taken until you have drawings you are happy with.