Home › Everything we make › Timber Cladding › Fife
Fife · Scotland
Timber Cladding in Fife
Larch, cedar or thermowood rainscreen on a ventilated batten cavity.
- Free measured survey
- Fixed written quote
- Workshop-made, site-fitted
- 10-year workmanship guarantee
- Fully insured
Fife is a county of pantiled fishing-village cottages, Georgian townhouses and modern commuter estates. That is exactly the kind of building stock a run of timber cladding has to be drawn around, so we allow for it at survey stage rather than on fitting day — walls get checked for wind and plumb, floors for level, and the setting-out is taken from the worst reading, not the best.
How we approach it
Off-the-shelf units are made to standard sizes and then filled out with scribe strips. Our run of timber cladding work is cut to the dimensions taken from your Fife property, so there is no packing, no filler and no gap that opens up in year two.
How we build it
Timber is chosen for the room it is going into. Painted work is built in tulipwood and moisture-resistant MDF because they hold a crisp arris and take a sprayed finish without grain rise. Where the grain is meant to be seen we use European oak, walnut or ash, with veneers laid so the figure runs continuously across a set of doors.
Finish and materials
You can have it primed for your own decorator, sprayed in any RAL or heritage colour, or left in oiled timber. Oiled finishes can be refreshed at home; sprayed finishes are harder wearing and are what we recommend for kitchens and anything at knee height.
| Guide price | from £190 per linear metre, fitted |
|---|---|
| Lead time | 3–5 weeks from signed drawings |
| Construction | Siberian larch |
| Survey area | All of Fife, including Dunfermline, Kirkcaldy, St Andrews, Glenrothes |
Want a number now? The indicative price tool gives a range in about a minute. A free survey in Fife turns it into a fixed written quote.
Towns we cover
Other joinery for Fife
What happens next
Four steps, no surprises
Survey
A joiner visits, measures the opening, checks for level and plumb, and talks through how you want to use the space.
Drawings & quote
You get a setting-out drawing and a fixed written price. Nothing is ordered until you have approved both.
Workshop
Parts are machined, assembled and finished under cover while the site carries on with other trades.
Fit & handover
We fit, scribe, adjust and touch in, then walk you through care and adjustment before we leave.
Straight answers
Timber Cladding in Fife — common questions
Will it all go grey?
If untreated, yes, and unevenly at first — the sheltered areas silver more slowly than the exposed ones. It evens out over two to three years. If you want it to stay honey-coloured, expect to recoat every two to three years.
Is timber cladding a fire risk?
On a domestic house below 11m, standard timber cladding is generally acceptable, subject to distance from the boundary. Above 11m or on flats, non-combustible materials are required. We check the position against current regulations before quoting.
How long will it last?
Larch and cedar in a well-detailed, ventilated rainscreen give thirty to fifty years. The failures we are called to are nearly always detailing — no cavity, wrong fixings, or boards taken to ground level with no clearance.
Does cladding need a cavity behind it?
Yes. A ventilated and drained cavity on treated battens over a breather membrane is what keeps the boards dry from both sides. Cladding fixed straight to a wall will cup, and the wall behind will stay wet.
Do you charge for the survey and drawings?
The measured survey and the quotation are free. If you want fully detailed manufacturing drawings or a 3D visual before committing, that is chargeable and the fee comes off the job if you proceed.
Start with a measurement
Tell us the space in Fife — we’ll tell you what it costs
Every quote starts with a free measured survey, so the price you get is the price you pay. No deposit is taken until you have drawings you are happy with.