Home › Everything we make › Timber Cladding › Shropshire
Shropshire · Midlands
Timber Cladding in Shropshire
Larch, cedar or thermowood rainscreen on a ventilated batten cavity.
- Free measured survey
- Fixed written quote
- Workshop-made, site-fitted
- 10-year workmanship guarantee
- Fully insured
Shropshire is a county of timber-framed and brick town houses, stone cottages and scattered rural farmsteads. That is exactly the kind of building stock a run of timber cladding has to be drawn around, so we allow for it at survey stage rather than on fitting day — walls get checked for wind and plumb, floors for level, and the setting-out is taken from the worst reading, not the best.
How we approach it
Every run of timber cladding we make starts with a site survey and a set of setting-out drawings, not a catalogue page. We measure the opening in Shropshire, check the walls for wind and the floor for fall, then cut a carcass that fits the room you actually have.
How we build it
Hardware is specified to the weight it is carrying, not to a price point. Soft-close runners are rated for the drawer load, hinges are adjustable in three planes, and sliding gear is sized so a full-height door still moves with one finger a decade later.
Finish and materials
You can have it primed for your own decorator, sprayed in any RAL or heritage colour, or left in oiled timber. Oiled finishes can be refreshed at home; sprayed finishes are harder wearing and are what we recommend for kitchens and anything at knee height.
| Guide price | from £190 per linear metre, fitted |
|---|---|
| Lead time | 3–5 weeks from signed drawings |
| Construction | Siberian larch |
| Survey area | All of Shropshire, including Shrewsbury, Telford, Oswestry, Bridgnorth |
Want a number now? The indicative price tool gives a range in about a minute. A free survey in Shropshire turns it into a fixed written quote.
Towns we cover
Other joinery for Shropshire
What happens next
Four steps, no surprises
Survey
A joiner visits, measures the opening, checks for level and plumb, and talks through how you want to use the space.
Drawings & quote
You get a setting-out drawing and a fixed written price. Nothing is ordered until you have approved both.
Workshop
Parts are machined, assembled and finished under cover while the site carries on with other trades.
Fit & handover
We fit, scribe, adjust and touch in, then walk you through care and adjustment before we leave.
Straight answers
Timber Cladding in Shropshire — common questions
Does cladding need a cavity behind it?
Yes. A ventilated and drained cavity on treated battens over a breather membrane is what keeps the boards dry from both sides. Cladding fixed straight to a wall will cup, and the wall behind will stay wet.
Will it all go grey?
If untreated, yes, and unevenly at first — the sheltered areas silver more slowly than the exposed ones. It evens out over two to three years. If you want it to stay honey-coloured, expect to recoat every two to three years.
Is timber cladding a fire risk?
On a domestic house below 11m, standard timber cladding is generally acceptable, subject to distance from the boundary. Above 11m or on flats, non-combustible materials are required. We check the position against current regulations before quoting.
How long will it last?
Larch and cedar in a well-detailed, ventilated rainscreen give thirty to fifty years. The failures we are called to are nearly always detailing — no cavity, wrong fixings, or boards taken to ground level with no clearance.
How long does a bespoke job take from order to fitting?
Most fitted furniture runs four to eight weeks from approved drawings to fitting day. Kitchens, staircases and timber windows are longer at eight to fourteen weeks because the components are larger and the finishing schedule is longer. We give you a date band at quotation and confirm the fitting week once the drawings are signed off.
Start with a measurement
Tell us the space in Shropshire — we’ll tell you what it costs
Every quote starts with a free measured survey, so the price you get is the price you pay. No deposit is taken until you have drawings you are happy with.