Home › Everything we make › Under-Stairs Storage › Edinburgh
Edinburgh · Scotland
Under-Stairs Storage in Edinburgh
Pull-out drawers and cupboards that use the awkward triangle under a flight.
- Free measured survey
- Fixed written quote
- Workshop-made, site-fitted
- 10-year workmanship guarantee
- Fully insured
Edinburgh is a county of Georgian New Town flats and Victorian tenements with tall ceilings and deep reveals. That is exactly the kind of building stock a run of under-stair storage has to be drawn around, so we allow for it at survey stage rather than on fitting day — walls get checked for wind and plumb, floors for level, and the setting-out is taken from the worst reading, not the best.
How we approach it
We build under-stairs storage as cabinetmakers rather than fitters: machined joints, real carcass construction, and a finish applied under workshop conditions before anything reaches your Edinburgh address.
How we build it
Carcass work is birch ply or MR MDF depending on span and load. Face frames and doors are solid hardwood. Everything is machined on the same setting so stiles, rails and reveals line through, and shadow gaps stay parallel from one end of the run to the other.
Finish and materials
Finishing happens in the workshop wherever possible. Sprayed paint gives an even film that brushwork cannot match, and the only work left on site is the final touch-in around scribes and fixings.
| Guide price | from £950 per linear metre, fitted |
|---|---|
| Lead time | 4–6 weeks from signed drawings |
| Construction | Birch ply |
| Survey area | All of Edinburgh, including Edinburgh, Leith, Morningside, Corstorphine |
Want a number now? The indicative price tool gives a range in about a minute. A free survey in Edinburgh turns it into a fixed written quote.
Towns we cover
Other joinery for Edinburgh
What happens next
Four steps, no surprises
Survey
A joiner visits, measures the opening, checks for level and plumb, and talks through how you want to use the space.
Drawings & quote
You get a setting-out drawing and a fixed written price. Nothing is ordered until you have approved both.
Workshop
Parts are machined, assembled and finished under cover while the site carries on with other trades.
Fit & handover
We fit, scribe, adjust and touch in, then walk you through care and adjustment before we leave.
Straight answers
Under-Stairs Storage in Edinburgh — common questions
How heavy can a pull-out unit be?
The runners we use are rated to 70kg per pair loaded. A tall pull-out full of coats and boots will get close to that, so the carcass is built in 18mm ply rather than MDF.
Will it work on a winder or curved stair?
Yes, but it takes more setting out and each unit is a different shape. Expect the price per metre to be higher than a straight flight.
Do you have to remove the existing cupboard door?
Usually yes. The standard builder's door under a stair wastes most of the volume behind it. Replacing it with a bank of pull-outs typically doubles what you can store and reach.
Can the meter or consumer unit stay accessible?
It has to. We build a removable or hinged access panel so the meter reader and an electrician can get to it without dismantling the joinery.
How long does a bespoke job take from order to fitting?
Most fitted furniture runs four to eight weeks from approved drawings to fitting day. Kitchens, staircases and timber windows are longer at eight to fourteen weeks because the components are larger and the finishing schedule is longer. We give you a date band at quotation and confirm the fitting week once the drawings are signed off.
Start with a measurement
Tell us the space in Edinburgh — we’ll tell you what it costs
Every quote starts with a free measured survey, so the price you get is the price you pay. No deposit is taken until you have drawings you are happy with.